Tiwari, V. K.
Vivek Kumar Tiwari has more than 15 yr of experience in process plant design and piping material engineering. He is regularly involved in piping material functions, including solving the issues related to piping materials during the design to commissioning stages of process plants. Tiwari holds a B.Tech. degree in chemical engineering and works for Reliance Industries Ltd., India.
Differential thermal expansion and welding problems in dissimilar joint of carbon steel to austenitic stainless-steel piping in high-temperature applications
Joining dissimilar piping materials has found widespread application in various process plant piping, most notably in jacketed piping with carbon-steel jackets and austenitic stainless-steel core piping with stainless-steel end closures that require welding to carbon-steel jacket piping.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction