Gupta, R. P.
Prevent failures in olefin-cracking operations
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Europe
/ Heat Transfer
/ Middle East
Failure analysis identifies root causes for damages to selective exchangers
Cracking in C3 cut/propylene Horton spheres
Here's how the problem was diagnosed and solved
Failure analysis of an ethylene cracking heater finned tube
Here's what caused the leak and the steps taken to prevent future leaks
Failure analysis of ethylene cracking heater convection section dilution steam tube
Several inspection techniques were required to determine the root cause of the failure
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Canada could restrict its oil exports to U.S. if Trump trade war escalates 3/13
- EIA: U.S. crude inventories rise, fuel draws down amid ongoing maintenance 3/13
- TotalEnergies and RWE join forces on green hydrogen to decarbonize the Leuna refinery 3/13
- Gasoline unit at Nigeria's Dangote oil refinery to undergo maintenance in June 3/13
- Indian refiners turn to Latin America, Africa to replace Russian oil in Feb. 3/13
- U.S. propane exports have increased every year since 2007 3/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction