Gupta, R. P.
Prevent failures in olefin-cracking operations
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Europe
/ Heat Transfer
/ Middle East
Failure analysis identifies root causes for damages to selective exchangers
Cracking in C3 cut/propylene Horton spheres
Here's how the problem was diagnosed and solved
Failure analysis of an ethylene cracking heater finned tube
Here's what caused the leak and the steps taken to prevent future leaks
Failure analysis of ethylene cracking heater convection section dilution steam tube
Several inspection techniques were required to determine the root cause of the failure
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

