Arbulu, R. J.
Roberto Arbulu has more than 20 yr of experience in the delivery and optimization of energy, industry, technology and infrastructure capital projects with various owners worldwide. For many years, Arbulu has participated as a Virtual Design and Construction (VDC) instructor and a technical advisor at Stanford University’s Center for Integrated Facility Engineering. He is a member of the Gulf Downstream Association’s (GDA’s) Project Management Technical Committee and supports the Project Production Institute as an instructor. He earned a degree in civil engineering from Pontificia Universidad Católica del Perú, and an MS degree in construction engineering from the University of California at Berkeley.
Are resources and capacity the same?
If you are involved in the delivery of capital projects, there is a good chance that you may have heard, or even used, expressions such as, “We have a resource-loaded schedule,” “We are behind schedule, so let’s add more resources,” or “We need to increase our capacity.”
- 1
- ... 1 pages
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries