Tellini, M.
Low-pressure absorption of CO2 from flue gas: Plant economics with incentives
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Europe
/ Greenhouse Gases
/ Loss Prevention
/ Middle East
The precedent to this article, published in the April 2011 issue of Hydrocarbon Processing, discussed the chemical feasibility and process engineering design to absorb carbon dioxide (CO2) from flue g..
Low-pressure absorption of CO2 from flue gas
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Acid Gas Removal
/ Carbon Management
/ Corrosion
/ Europe
/ Natural Gas
/ Treating
Case study accomplished 95% sequestration using methyldiethanolamine aqueous solution
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NextChem Tech selected as engineering and technology partner for Aliplast’s upcycling plant project in Italy 3/29
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction