DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature (sponsored): Three questions oil and gas companies should ask to improve their operations risk management 3/6
- Nextchem awarded engineering/technology services contract from SATORP (Saudi Arabia) 3/6
- PBF Energy's Martinez refinery (California, U.S.) repairs to cost $30 million 3/6
- Lummus Technology, Resynergi announce commercialization of microwave-powered plastic pyrolysis technology 3/6
- Mercedes-AMG Petronas to use sustainable carbon fiber composites in Formula 1 racecars 3/6
- Vopak to build ethane tanks to support Thailand's petrochemical production 3/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction