Yusoff, D.
Dasuki Yusoff is a Staff Engineer with Petronas Gas Berhad in Malaysia. He has 12 yr of experience in maintenance, condition monitoring, troubleshooting and reliability improvements of rotating and turbomachinery equipment in gas processing and utilities plants. He earned a Bch degree in mechanical engineering from Universiti Teknologi Malaysia. He is a certified vibration analyst CAT-III from the Mobius Institute.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction