Gupta, A.
Amit Gupta is the Director of Furnace Technology and Proposal with Petro-Chem Development Co. Inc. He has more than 24 yr of experience in the design of process fired heaters, cracking furnaces and emissions reduction systems. He has held positions at Engineers India Ltd. and Technip (KTI Corp.) before joining Petro-Chem Development Co. Inc., which was later acquired by Heurtey Petrochem. Heurty was acquired by Axens in 2017. Mr. Gupta holds a BS degree in chemical engineering from Panjab University in India.
Flow modeling as a tool for WHRU performance optimization
Process Optimization
/ Refining
/ Petrochemicals
/ Gas Processing/LNG
/ Heat Transfer
/ Carbon Management
/ Environment & Safety
/ Information Systems
Greenhouse gas (GHG) emissions have become a growing concern for many industrialized countries over the past few years.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction