Allen, B.
Brad Allen is a Certified Water Technologist based out of Calgary, Alberta, Canada. As a Senior Technical Services Manager for Pace Solutions, he is experienced in every aspect of industrial water treatment. Part technician and part investigator, he enjoys taking a hands-on approach toward problem finding and resolution for each unique water system he services.
Upkeep down the pipe: Plant shutdowns and water treatment
The maintenance checklist for a plant shutdown can sometimes look intimidating and, in the face of a short timeline, unnerving.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium introduces world's first pharmaceutical bottle partially made with wood-based plastics 10/30
- Aramco, Petrovietnam sign Collaboration Framework Agreement for increased petrochemicals trade 10/30
- TotalEnergies studies Moroccan project to export green ammonia to Europe 10/30
- Changxing Island accelerates development of world-class green petrochemical industrial base 10/30
- U.S. gasoline stockpiles hit 2-yr low on stronger demand 10/30
- Dangote says refinery has 500 MM liters of petrol in storage, can meet Nigeria's demand 10/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction