Ott, P.
Pedro Ott joined Optimized Gas Treating Inc. in 2018 as a Senior Applications Engineer in Business Development, providing marketing, licensing and technical support to ProTreat and SulphurPro customers. With over 25 yr of experience, he is an expert in acid gas treating, sulfur recovery, gasoline and distillates hydroprocessing, sour water stripping and LNG. He holds a BS degree in chemical engineering from Simón Bolívar University in Venezuela and a specialization in petroleum refining and gas from IFP School in France. In addition to English, he is fluent in Spanish and French.
Stack gas scrubbing to meet IMO’s 0.5% sulfur bunkering requirement
The International Maritime Organization implemented the IMO 2020 regulations on January 1, 2020.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction