Xu, Q.
Consider novel CGC and front-end depropanizer system for olefins production
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Compressors
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
Operational optimization for mixed-refrigerant systems
Use rigorous simulation to improve process efficiency
Fine-tune ethylene unit startups
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Engineering & Design
/ Europe
/ Middle East
/ Rotating Equipment
Advanced modeling methods provide useful information on operating main compressor system and feeds
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Portugal's Galp plans to start producing biofuels in 2026 12/20
- Prax and Shell call off deal on stake in PCK Schwedt oil refinery 12/20
- Nigeria's Dangote Refinery hits 85% refining capacity 12/20
- India's BPCL buys first Argentinian crude oil cargo for Feb. delivery 12/20
- Sinopec's Zhenhai oil refinery expands capacity to 40 MMtpy 12/20
- Oil via Russia's Druzhba pipeline halted by technical problems 12/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction