Al-Mutairi, F.
Faisal Al-Mutairi is a chemical engineer at KNPC’s MAA refinery and works in the Operational Planning division.
Refineries’ pandemic turmoil—KNPC’s gasoline demand: Opportunities and challenges
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Aromatics
/ Catalysts
/ Construction
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Hydrogen
/ Hydrotreating
/ Loss Prevention
/ Management
/ Naphtha
/ Polymers
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Utilities
/ Middle East
The COVID-19 pandemic is regarded as one of the most exceedingly difficult challenges faced in the oil and gas industry's history.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction