Schafer, T.
Tom Schafer is Vice President of Koch Modular Process Systems. He has more than 45 yr of experience in process design, operations management, cost estimating, plant layout, and sales and marketing, as well as equipment design, including distillation, heat transfer, fluid flow and process control. Schafer earned a BS degree in chemical engineering and an MS degree in chemical engineering from Manhattan College in New York City, New York.
Decarbonization is at the forefront of environmental innovation
Petrochemicals
/ Project Management
/ Refining
/ Carbon Management
/ Construction
/ Engineering & Design
/ Equipment
/ Products
Earth’s carbon dioxide levels have increased appreciably within the last several decades, which directly correlates to rising environmental concerns of GHG emissions, pollution and disruptions of marine and terrestrial environments, among others.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction