Fazzini, M.
Marco Fazzini is an R&D Manager at Koch Heat Transfer Company LP in the US. He has more than 9 yr of experience in the application of advanced heat transfer technologies for the design of tubular heat exchangers. He holds a mechanical engineering degree from Politecnico of Milan, and an MS degree from Chalmers University of Technology in Sweden.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction