Tsang, R.
Raymond Tsang is the Process Engineering Manager at Koch-Glitsch, UK. He has more than 30 yr of experience in the design of fractionation equipment. Mr. Tsang earned a BS degree in chemical engineering from the University of Newcastle upon Tyne in the UK.
Good distributor design for high-velocity feed debottlenecks a crude preflash tower
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Pumps
/ Europe
Bazan Group’s crude unit No. 3—not designed by any of the authors’ companies—was bottlenecked by the preflash tower.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium introduces world's first pharmaceutical bottle partially made with wood-based plastics 10/30
- Aramco, Petrovietnam sign Collaboration Framework Agreement for increased petrochemicals trade 10/30
- TotalEnergies studies Moroccan project to export green ammonia to Europe 10/30
- Changxing Island accelerates development of world-class green petrochemical industrial base 10/30
- U.S. gasoline stockpiles hit 2-yr low on stronger demand 10/30
- Dangote says refinery has 500 MM liters of petrol in storage, can meet Nigeria's demand 10/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction