Griffiths, E.
Edward Griffiths is a Technology Manager for K-SAAT™ alkylation technology at KBR. He has 13 yr of refining and petrochemicals experience in process engineering, plant operations and technology licensing. Mr. Griffiths earned an MEng degree in chemical and process engineering from Newcastle University, UK.
Meeting the Tier 3 challenge with ultra-clean alkylate
Environment & Safety
/ Process Optimization
/ Refining
/ Catalysts
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Octane
/ Reactors
/ Sulfur
/ Treating
/ Americas
The U.S. Environmental Protection Agency (EPA) introduced Tier 3 gasoline sulfur standards in 2017, requiring all U.S. gasoline producers to adhere to an annual 10-ppm average sulfur limit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BPCL plans $11-B refinery and petrochemical project in South India 12/26
- Mexico's new Olmeca refinery operated at 17% of capacity in November 12/26
- Relevant Industrial announces acquisition of Loy Instrument Inc. 12/26
- Indian state refiners may buy Middle East spot oil to replace Russian shortfall 12/26
- Stellantis unit to pay $4.2 MM to resolve California (U.S.) emissions probe 12/26
- Japan's Taiyo Oil to shut two CDUs at Shikoku refinery for maintenance 12/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction