Blair, H.
Heather Blair is an FCC Technical Engineer for Johnson Matthey. She is responsible for analysis, recommendations and customer interface in the FCC additives business. She started her career with HollyFrontier in Cheyenne, Wyoming, as a Product Blending Engineer. She has 10 yr of experience in the refining industry. Ms. Blair earned BS and MS degrees in chemical engineering from the University of Wyoming.
FCC NOx reduction methods: Complying with regulations without capital investment
Environment & Safety
/ Process Optimization
/ Refining
/ Carbon Management
/ Catalysts
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Octane
/ Products
/ Reactors
/ Sulfur
/ Americas
As fluid catalytic cracking (FCC) nitrogen oxides (NO<sub>x</sub>) emissions regulations become increasingly strict, refiners are driven to find the most economic compliance option.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction