McLeod, G.
Gavin McLeod has more than 40 yr of oil and gas experience, with an emphasis on systems completion and commissioning.
Phase-gate process for optimal turnaround performance: Long-range turnaround planning
The volume of turnaround (TAR) work in a limited physical space and within a compressed timeframe presents challenges for securing the required qualified workforce and ensuring quality control and health, safety and environment. For these reasons, excellent TAR planning is critical for successful outcomes.
Best practices for proper alarm management
Process alarms are critical safeguards put into place on operating units to enable operators to avoid incidents that impact a company’s safety, reliability and bottom line. It is absolutely essential to any safe facility operation that alarms are properly managed and utilized to address real and consequential operational issues before they become incidents.
Maximize benefits with robust maintenance planning and scheduling
Effective routine maintenance begins with effective leadership. Leadership requirements for a robust routine maintenance program include some high-level deliverables.
Operational excellence: Repetitive incidents in the energy business
Workforce demographics in the oil, gas, chemicals and other energy industries have altered personnel experience ratios.
- 1
- ... 1 pages
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29

