Razalli, R. M.
Razmahwata Bin Mohamad Razalli is a Lead Engineer for IGL Services Sdn Bhd, and earned both BA and MEng degrees. With more than 25 yr of experience in the oil and gas industry in both design and operations, he has upstream and downstream experience in process safety, measurement and allocation, process engineering and offshore technical support, and is also a training provider. The author can be reached at razmahwata.razalli@igl.com.my.
Gas flaring system design and optimization with commercial simulation tool
In the chemicals, petroleum refining and natural gas industries, gas flaring systems are commonly installed for safe operation to burn associated and non-associated gases.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Utilizing steam stripping to remove benzene from wastewater and waste streams: A guide to maintaining compliant benzene levels with confidence 4/15
- OQ, Royal Vopak partner to accelerate development of Duqm as an integrated industrial hub 4/15
- Samsung E&A awarded contract for polylactic acid plant in the UAE 4/15
- Kuwait commences merger of state oil firms KNPC and KIPIC 4/15
- Russia well prepared for refinery maintenances with high fuel stockpiles 4/15
- Japan's Fuji Oil restarts 143,000-bpd Sodegaura CDU after fire 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction