Oleszczuk, G.
has worked in control and optimization industrial processes for 15 years, with more than eight years at Honeywell as an advanced solutions operation leader. He has implemented several APC and OTS solutions across Europe and North Africa. Dr. Oleszczuk gained his PhD in automation and dynamics at Old Dominion University in Virginia, and an MSc degree in chemical engineering and automation control at Warsaw University of Technology in Poland. He specializes in process dynamics modeling.
Utilize APC solutions to resolve hydrocracker conversion optimization challenges
Petrochemicals
/ Process Control
/ Refining
/ Diesel
/ Hydrocracking
/ Information Systems
/ Naphtha
Improving profits and reducing costs remain priorities for owner/operators and management.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- IEA comes under pressure from former oil market chief to cut energy transition focus 1/30
- Emerson to acquire remaining outstanding shares of AspenTech 1/30
- Bahri, Petredec partner to meet Saudi Arabia’s growing LPG and ammonia shipping needs 1/30
- Indian state studies plan to ban petrol, diesel vehicles in Mumbai to control pollution 1/30
- SQUAKE and NX Group partner to offer CO₂ insets to NX Group’s customers 1/30
- Repsol to use Enerkem's advanced gasification technology for its Ecoplanta facility in Spain 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction