Kanda, A.
Amit Kanda is Project Manager at GTC Technology and has more than 15 yr of experience in process technology, detailed engineering and plant operations. He specializes in project execution and has managed several projects. He received a BS degree in chemical engineering from Thapar Institute of Engineering & Technology in India, and an MS degree in chemical engineering from the the Illinois Institute of Technology in Chicago.
Create a network of dividing wall columns in complex process units
The majority of dividing wall column (DWC) applications in the refining industry consist of standalone columns, whether a retrofit or a grassroots column.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction