Shin, H. J.
Hye-Jin Shin is a process engineer at GS E&C with a BS degree in chemical engineering from Hongik University in Seoul, Korea. She has been involved in process simulation and verification of refineries and petrochemical plants. Her focus is modeling separation systems, especially dividing wall columns for economic design and safe operation.
Exploiting classic design heuristics for DWC design and optimization
The history of the refinery and petrochemical industry is filled with a variety of challenges, followed by the development of state-of-the-art technologies to overcome those hurdles. New legislation has required more environmentally friendly product specifications, while energy costs have kept rising.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

