Renick, J.
John Renick is Senior Director, Business Unit Solutions–APM for GE Digital. For more than 20 yr, he has worked with asset-intensive industries to define, grow and deliver APM solutions. Throughout his years of experience, he has been a leader in the APM space. He has directed innovation in areas such as asset condition monitoring, GIS integration, mobility and operator-driven reliability, big data, analytics and the IIoT.
Digital: Transitioning from the spreadsheet to the Cloud
Environment & Safety
/ Gas Processing/LNG
/ Petrochemicals
/ Process Optimization
/ Refining
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Pumps
/ Reactors
/ Rotating Equipment
/ Safety
/ Turbines
/ Utilities
/ Valves
/ Asia/Pacific
The Industrial Internet of Things is expected to create a $225-B market by 2020, opening new opportunities for industrial organizations related to data and asset management.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction