De Maria, R. L.
HP Viewpoint: Consider integral-gear compressors in CO2 services
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Compressors
/ Construction
/ Drivers
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Rotating Equipment
/ Safety
In 1998, the author began researching suitable technology for compressing 95 MMSCFD of “bone dry” (–100°F dew point) carbon dioxide (CO2) from 16.7 psia to 2,710 psia. The compress..
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction