Van Doorn, E.
Edwin van Doorn is a Fluor Corp. Fellow and Director of heat transfer at Fluor Amsterdam, with more than 20 yr of experience in industry. He serves on the Technical Committee HTRI and Expert Area Energy Efficiency Committee. Mr. van Doorn obtained his academic degree in engineering from the University of Eindhoven.
Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?
A reboiler provides the necessary heat duty for the separation in a distillation tower.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

