Nangia, K. K.
Krish K. Nangia is a Process Technology Director/Senior Fellow with Fluor Enterprises in Aliso Viejo, California. He has more than 40 yr of experience in petroleum refining, gas processing and petrochemical projects. Dr. Nangia holds a BS degree in chemical engineering from Delhi University, and a PhD from McGill University. He is a registered PE in California.
Process design consideration for a deep-cut vacuum distillation unit—Part 2
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Engineering & Design
/ Equipment
/ Products
/ Pumps
/ Reactors
Recently, many US refineries have been reconfigured to process heavy opportunistic sour crudes.
Process design consideration for a deep-cut vacuum distillation unit—Part 1
Process Optimization
/ Refining
/ Catalysts
/ Construction
/ Distillation
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Products
/ Reactors
In the recent past, many US refineries have been reconfigured to process heavy opportunistic sour crudes.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction