Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12

