Bahadur, A.
Avadhesh Bahadur is a Mechanical Engineer at Fluor Daniel India Pvt. Ltd. He holds an MTech degree in engineering from the Indian Institute of Technology in Kanpur, India and is a member of the Institute of Mechanical Engineers (UK).
Design considerations for rigging and transportation of large process columns
Design guidelines for rigging and transporting large process columns are outlined in this article, along with the various aspects that should be considered during the initial design phase of equipment.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Southern Energy Renewables and Axens Sign MoU to advance SAF projects in Louisiana and beyond 4/8
- One of the largest heat pumps in the world has reached BASF's Ludwigshafen site 4/8
- TotalEnergies extends its fuel price cap policy in France until the end of April 4/7
- Navigating the montan wax challenge with renewable alternatives for polymers 4/7
- AFR selects Axens as technology provider for Texas (U.S.) refinery 4/7
- Iran has attacked Saudi Arabia's Jubail petrochemical complex, IRGC says 4/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

