Chaudhuri, S.
Sushree Chaudhuri is a Process Engineer with Fluor New Delhi. She has 17 yr of experience in petroleum refining, petrochemicals, offshore oil and gas and flare systems, and front-end and detailed design. Ms. Chaudhuri earned BS degrees in chemistry and chemical engineering from the University of Calcutta.
Conceptualizing a mega-integrated refinery and petrochemical complex: A case study
Aromatics
/ Carbon Management
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Distillation
/ Economics
/ Environment & Safety
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Asia/Pacific
/ Information Systems
/ Loss Prevention
/ Management
/ Naphtha
/ Octane
/ Piping
/ Polymers
/ Products
/ Pumps
/ Reactors
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Refining
/ Safety
/ Utilities
<i>Integration</i> is the new keyword for sustainability and profit in today’s oil and gas market scenario.
Selecting flare gas recovery system for a greenfield refinery
Carbon Management
/ Compressors
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Safety
/ Valves
Overall energy management and operational conservation have become crucial factors for profitability in today’s refining segment.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant, Technip Energies to introduce new catalyst for low steam-to-oil ratios in styrene production 4/9
- Indian Oil Corp to build $7.1-B dual-feed cracker in Odisha state 4/8
- bp halts plans to make clean jet fuel at Spain plant 4/8
- Suncor reports planned equipment shutdown at Montreal refinery 4/8
- India's HPL to start maintenance turnaround at Haldia petrochemical complex in mid-April 4/8
- Holcim, IGNIS P2X and Exolum present ECO2FLY: a pioneering project for the decarbonization of the construction materials and air transport industries 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction