Ghaisas, N.
Investigate power limitations in a large steam turbine
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Drivers
/ Drying
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Heat Transfer
/ Loss Prevention
/ Management
/ Middle East
/ Motors
/ Polymers
/ Reactors
/ Rotating Equipment
/ Safety
/ Turbines
/ Utilities
/ Valves
An investigation was carried out to rectify power limitations for a steam-turbine driver of a cracked-gas compressor (CGC) in a world-class ethylene plant.DescriptionThe turbine is a nine-stage, impul..
Case history: Improve refrigeration compressor performance
Gas Processing/LNG
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Drivers
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Rotating Equipment
This case examines the mechanical distress and performance deterioration of a critical refrigeration compressor that was installed at a world-scale petrochemicals complex.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vitol to charter supertankers from U.S. to Nigeria's Dangote refinery 4/26
- Refiner Valero beats profit estimates on resilient demand, tight supplies 4/26
- Diamond Green Diesel approves a SAF project at Port Arthur, Texas (U.S.) 4/26
- Wartsila secures China’s largest-ever methanol newbuild order 4/26
- Aspen Technology introduces new strategic planning for sustainability pathways solution 4/26
- Imperial Oil gets Q1 boost from higher production; refining throughput weighs 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction