Bloch, K.
Update your reliability performance to meet process safety expectations
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Management
/ Middle East
/ Safety
Better risk assessment can identify root causes for potential site catastrophes before they occur
Extreme failure analysis: never again a repeat failure
Apply root-cause failure analysis to recurring reliability problems
Dealing with deceptive failure modes
Chemical failure mechanisms can disguise themselves as mechanical and vice versa
HP Water Management: Appreciating the power of water
You need not look hard within a process plant to find key technical and production personnel who overlook improvement opportunities within industrial water systems. This oversight is often rooted in t..
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction