Worrell, J.
John Worrell has covered all areas of filtration during his 29-yr career and is widely known for his expertise in catalyst reactor bed pre-filtration. He has worked alongside vendors to develop solutions to fill product gaps, trained distributors and end users on filter technologies and applications, and managed global sales teams and filtration product teams. He leads FTC’s global sales initiatives, and oversees and directs the sales channels.
How hydroprocessing feed filtration system design impacts process reliability and efficiency
Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Hydrotreating
/ Loss Prevention
/ Reactors
Oil refining is an exceptionally complex industry, with much of the inherent complexity stemming from wide regional variances in crude quality and composition, plant capabilities and the types of products produced.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction