Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnEarth awards FEED contract to Kent for the Prinos CO₂ Storage Project in Northern Greece 3/12
- Axens joins consortium trying to develop an eFuels plant in Australia 3/12
- Southern Energy Renewables announce $1.4-B methanol and SAF complex in Louisiana 3/12
- Clariant successfully demonstrates advanced pyrolysis oil upgrading technology for circular plastics with Borealis and SINTEF 3/12
- Indorama Ventures' consortium to develop state-of-the-art rPET facility in Nigeria 3/12
- U.S. sues California over zero emissions vehicle, greenhouse gas rules 3/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

