Flannery, M.
Mason Flannery is a Product Marketing Manager for Flow Measurement products at Endress+Hauser. He began his career with Endress+Hauser in the rotational engineering program and has spent time in tech support, inside sales, application engineering and as a Regional Flow Product Business Manager. Flannery has extensive field experience with flow measurement in industrial environments and a wide range of application knowledge. He earned a BS degree in industrial distribution from Texas A&M University.
Optimize energy consumption with modern instrumentation
Analyzers
/ Automation
/ Digital Technologies
/ Environment & Safety
/ Equipment
/ Information Systems
/ Instrumentation
/ Loss Prevention
/ Petrochemicals
/ Process Optimization
/ Refining
The global pressures posed by climate change and other environmental challenges have elevated sustainability to a worldwide corporate priority.
- 1
- ... 1 pages
Current Digital Edition
![](/media/1ychqec4/hp-july-2024-catalysts.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Clariant, OMV aim to reduce carbon footprint of ethylene and ethylene oxide derivatives 7/31
- Ampol, Graincorp collaborate for potential renewable fuels plant in Australia 7/31
- Brazil's JBS supplies animal waste for production of sustainable aviation fuel 7/31
- United is first airline to purchase SAF for O'Hare Int'l airport (Chicago, U.S.) 7/31
- Egypt aims to keep diesel prices subsidized 7/31
- illimity, Trafigura lend money to Italian refinery for energy transition 7/31
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction