Lindhjem, E.
Erik Lindhjem is the Vice President and General Manager of Emerson’s Reliability Solutions business. In this role, he is focused on driving digital transformation through plant asset management of automation assets and machinery that enables clients to reach top quartile performance. Lindhjem joined Emerson as Vice President of Reliability Solutions and Consulting, Asia Pacific, in August of 2018, based in Singapore. He earned a Bch degree in mechanical engineering from the University of Virginia, and an MBA degree from Wake Forest University.
Take the anxiety out of plant turnarounds
Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Project Management
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ People
/ Rotating Equipment
/ Valves
The months leading into an impending turnaround (TAR) have never been an easy time for operations and maintenance personnel.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction