Beebe, D.
Dustin Beebe is the Vice President of Performance Software for Emerson. He is responsible for aligning the global control performance, operator performance and simulation businesses and the strategy synergy between Emerson and AspenTech. Before joining Emerson, Beebe served as the President of ProSys until Emerson acquired it in 2018. He has been in the industrial automation business since 1996. Beebe earned a BS degree in chemical engineering from the University of Arkansas in Fayetteville, Arkansas.
Don’t just survive: Thrive with advanced process control
Environment & Safety
/ Process Control
/ Process Optimization
/ Construction
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
There is a new adage in process manufacturing circles, and it resonates particularly deeply in the hydrocarbon industry: If you do not like market factors today, just wait a month.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction