Murray, J.
Jonathan Murray is director of IntelliSAW products at Emerson, focusing on new business strategies, product development and marketing of the IntelliSAW Critical Asset Monitoring (CAM) Platform. Prior to joining IntelliSAW, Mr. Murray focused on automation and control systems for smart grid, energy storage and electric vehicles, holding positions such as business unit manager, business development manager, project manager and senior engineer. He holds a BS degree in electrical engineering from the University of Massachusetts.
Monitor medium-voltage switchgear in refineries
Environment & Safety
/ Loss Prevention
/ Refining
/ Information Systems
/ Management
/ Safety
/ Utilities
When medium-voltage switchgear (MVS) in a refinery fails, it can force a process unit or even an entire refinery to shut down.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction