Casado Flores, E.
Improve pressure drop calculations for saturated water lines
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Middle East
/ Piping
/ Safety
/ Utilities
/ Valves
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Maximum throttling of manual valves without damage
Use these graphs to avoid damage to internals and piping
Avoid cavitation in butterfly valves
Use these coefficients to determine safe throttling positions
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Evonik presents innovative "Debonding on Demand" concept for more sustainable bonding 4/3
- Oil, gas and refined product imports exempted from Trump’s sweeping tariffs 4/3
- Reliance: India's gasoline demand to peak by 2035, diesel by 2041 4/3
- Mabanaft, HIF Global sign agreement to accelerate e-methanol adoption in the shipping industry 4/3
- Burckhardt Compression awarded digital monitoring services contract for a chemical plant in Saudi Arabia 4/3
- Lummus completes successful startup of electric heater demonstration unit 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction