Gulyani, B. B.
Temperature cross-based criterion for multipass heat exchanger design
A simple equation and graphic procedure give better results
Simple equations for pipe flow analysis
Calculations apply to a wide range of Reynolds numbers
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction