Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Repsol to use Enerkem's advanced gasification technology for its Ecoplanta facility in Spain 1/29
- Lyondell begins shuttering Houston refinery (U.S.) for permanent closure 1/29
- Pertamina partners with ABL to enhance asset management at its Cilacap refinery (Indonesia) 1/29
- Russia's Sibur suspends output at petrochemical plant east of Moscow after drone attack 1/29
- Motiva shuts FCC, alkylation units at its Port Arthur, Texas (U.S.) refinery 1/29
- ExxonMobil and Trammo sign HOA for low-carbon ammonia offtake 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction