Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ketjen announces pricing adjustment for hydroprocessing catalysts effective January 15, 2026 1/9
- Germany's Uniper nears agreement to buy green ammonia from India 1/9
- Digital Exclusive—Valve maintenance: An open and shut case? 1/9
- Serbia's Russian-owned NIS refiner buys first crude since U.S. sanctions waiver 1/9
- U.S. refiner Marathon Petroleum says it will be bidding for Venezuelan crude oil 1/9
- Shell flags chemicals and products unit loss, raising doubts over $3.5 B buyback 1/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

