Poussin, G.
Guillaume Poussin is the Group Managing Director at CREALYST-Group. He has more than 15 yr of experience in the study and development of technologies concerning particle behavior during filling processes of cylindrical vessels for different applications (e.g., for catalysts and adsorbents and the agricultural storage of grain).
Solving maldistribution: Catalyst loading and why it matters
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Reactors
/ Americas
/ Europe
Are your reactor yields lower than forecast? Does your fixed-bed catalytic reactor suffer from hotspots?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction