Lai, H.
Haiming Lai is a Principal Consultant with Integrated Oilsands and Bitumen Project of China National Offshore Oil Corp. (CNOOC) in Calgary, Canada. He has more than 20 yr of experience in modeling and simulation, process design and operation in the upgrading, refining and petrochemical industries. He holds a PhD in chemical engineering from Beijing University of Chemical Technology and is a registered professional engineer in Alberta, Canada.
Debottleneck H2 production for gasifier PSA-based plant
The Canadian oil sands reserves in the area surrounding Fort McMurray, Alberta in Canada contain in excess of 165 Bbbl of recoverable bitumen.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction