Benomar, B.
Benourine Benomar has more than 35 yr of experience in projects, maintenance management and reliability of LNG, LPG and offshore oil production facilities. He has worked with major oil companies like SONATRACH (Algeria), ADNOC Group (UAE) and Technical Consultant EP2C Energy (Ireland). Presently, Benourine is a freelance consultant. He earned his Bsc. degree in mechanical engineering from Plymouth Polytechnic (UK) and an MBA from Nancy2 University (France).
Nine steps for effective preparation of planned shutdowns—Part 2
As organizations increasingly prioritize resource optimization, performance and sustainability, executing a successful shutdown (SD) has become more challenging.
Nine steps for effective preparation of planned shutdowns—Part 1
Planned shutdowns (SDs) are critical events that can significantly impact production and expenditures. Poor planning and preparation can directly affect the success of any SD, making attention to detail imperative.
The preventive maintenance “Job Plan 2.0”
The purpose of a preventive maintenance (PM) plan is to sustain the functionality or condition of an asset based on pre-established job plans with tasks to be executed at regular operating hours, elapsed time periods or work cycles.
- 1
- ... 1 pages
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21