Dixit, P.
Pramod Dixit works as a freelance consultant operating from Baroda, India. He provides informative lectures and training to engineers working in engineering, operations, inspection and maintenance groups of process plants and engineering companies. He has more than 44 yr of experience working at different positions in Indian companies, including Engineers India Ltd., L&T-Chiyoda Baroda, and ESSAR Offshore and Subsea Ltd. in greenfield and brownfield projects. He earned a BTech degree (mechanical) from IIT Roorkee India.
Project Management: Check installation of the tray column before box-up
To push the project schedule, plant owners sometimes proceed the boxing up of columns without approval of the tray designer.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction