Ganapathy, V.
Rethink planning for heat-recovery systems
Better early design of steam generators can save lots of money in operating cogeneration plants
How emissions affect HRSGs
Here’s how NOx and CO control methods influence designs
Optimize energy efficiency of HRSG
With a better understanding of temperature profiles, plant engineers can increase steam production and minimize losses
Superheaters: design and performance
Understand these factors to improve operation
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction