Aleynik, B.
Boris Aleynik co-authored this article, but is no longer employed by Emerson. He was formerly part of the team responsible for Rosemount liquid analysis products. He holds a BS degree in mechanical engineering from Iowa State University and an MBA degree from the Kellogg School of Management, Northwestern University.
Improved cooling system performance begins with data
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Analyzers
/ Compressors
/ Corrosion
/ Crude oil
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
/ Americas
Refineries consume large amounts of energy and water to refine crude oil into products. Up to 10% of crude oil’s energy content is consumed during processing, and it takes 1.5 bbl of water to process one barrel of crude oil. Refining processes also generate large quantities of excess thermal energy that needs to be expelled into the environment using a once-through or recirculating cooling system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Chinese refiners buy oil from storage, raise output with fresh import quota 12/5
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

