Davis, R.
Robert Davis is a Process Engineer working for ConocoPhillips Australia. He has 7 yr of experience in the oil and gas industry working with the Optimized Cascade Process. He earned a BE degree in chemical engineering and is a chartered member of IChemE.
Boil-off gas APC exceeds expectations
Gas Processing/LNG
/ Process Control
/ Process Optimization
/ Analyzers
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
/ Natural Gas
/ Asia/Pacific
The use of advanced process control (APC) technology on LNG liquefaction trains is well accepted with some of the earliest implementations developed in the late 1990s.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Online Exclusive: Trump Administration must state its position on climate and energy 1/21
- Trump lifts freeze on U.S. LNG export permit applications 1/21
- Lummus partners with Versalis (Eni) on licensing phenolics technologies 1/21
- Thai cabinet approves collection of carbon tax 1/21
- Removing microplastics with engineered bacteria 1/21
- Asia's fuel oil premiums more than double as Russian sanctions spark supply risks 1/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction