Huang, S.
Improve recovery of intermediate components with LNG
Using LNG as feed stream provides opportunities to optimize methods for recovering intermediate components in gas processing
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: A unified approach to methane emissions reporting (3) 2/4
- Borouge achieved a 24% increase in net profit in 2024, reaching $1.24 B 2/4
- Sasol, Anglo American and De Beers to pilot renewable diesel in South Africa 2/4
- Singapore Airlines Group, Aether Fuels sign MoU for SAF 2/4
- Thailand to import more U.S. ethane to reduce trade surplus 2/4
- China tariff retaliation targets its modest U.S. energy imports 2/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction