Chen, Y. H.
Yin-Hsien Chen is the Director of the Crackless Monomer Company and Cartell Chemical. He is experienced in cyanoacrylate adhesive manufacturing, achieving a JV between French Arkema group and Cartell Chemical Taiwan. He earned a BS degree in chemical and material engineering from the University of Auckland, along with an MS degree in management from Imperial College London.
An advanced extractive distillation process for aromatics recovery
Petrochemicals
/ Process Optimization
/ Aromatics
/ Catalysts
/ Economics
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
This article focuses on a novel extractive distillation (ED) process for recovering benzene, toluene and xylene (BTX) aromatics from a full-boiling-range pyrolysis gasoline or reformate feedstock—a process that has been commercially demonstrated and is ready for licensing or a JV.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Essar launches hydrogen power plant at Stanlow refinery (U.K.) 7/16
- Trelleborg partners with Airbus on hydrogen-powered air travel 7/16
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Vale, Komatsu and Cummins announce collaboration to develop dual-fuel large trucks, powered by ethanol and diesel 7/16
- Mexico–U.S. energy trade value fell in 2023 on lower fuel prices 7/16
- Belarus' Mozyr oil refinery restoring operations after outage due to storm 7/16
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction