Gerhardt, M.
Matthew Gerhardt is Vice President of industrial water at Brown and Caldwell, specializing in wastewater selenium and trace metals removal. He started his career at Chevron Research Co. and has more than 30 yr of experience in refinery water and wastewater treatment. He holds a BS degree in chemical engineering from Cornell University and a PhD in civil/environmental engineering from UC Berkeley.
Options for meeting wastewater effluent selenium limits
Wastewater treatment units (WWTUs) in petroleum refineries are designed to meet effluent limitations incorporated into National Pollutant Discharge Elimination System (NPDES) permits for “conventional pollutants.”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Neste, Mitsubishi Corporation agree on strategic partnership to develop supply chains for renewable chemicals and plastics 7/16
- Tecnimont awarded green ammonia plant study in India 7/15
- Audi, bp team up with strategic sustainable fuels partnership for Formula 1 7/15
- Iowa biodiesel industry commends Rep. Hinson on letter to EPA 7/15
- Singapore's 1H 2024 bunker sales rise on year but June sees a monthly decline 7/15
- Russia may reinstate gasoline export ban from August if shortages worsen 7/15
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction