Choudary, N. V.
What are the corrosion issues for gasohol?
New study investigates metal deterioration from ethanol-blended gasoline
Reevaluate the activity of your catalyst system
Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Catalysts
/ Europe
/ Middle East
Selecting optimum conditions for fluid catalytic cracking requires micro activity testing through an improved method
Fine-tune catalyst addition rates
Simple method dynamically optimizes E-catalyst activity in fluid catalytic crackers
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Trump to declare 'national energy emergency' to boost fossil fuels, power projects 1/20
- Russian fuel exports fall in 2024 as drone attacks, bans add to sanctions pressure 1/20
- India refiners ask ADNOC to offer oil delivered price as freight spikes 1/20
- China's 2024 low-sulfur marine fuel exports dip 1.6% vs. 2023 1/20
- Marathon restarts hydrotreater at Galveston Bay Refinery, Texas (U.S.) 1/20
- Sungrow Hydrogen wins supply contract for 320-MW green ammonia project in Oman 1/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction